Upcoming Events

June 2022
MTWTFSS
   1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30    
« May   Jul »

View All Events

2006 TxDOT EAST CORRIDOR STUDY

As described under Project History, TxDOT analyzed alternatives and developed a draft schematic design and environmental assessment for the I-30 and US 80 Corridors between 2004 and 2006, under the project name “The East Corridor”. However, the TxDOT study was not finalized due to agency priorities at the time, and the project was not environmentally cleared. The following is archive material from the 2006 study for information only. The current (2016) study will not be bound by the 2006 draft recommendations.

Project Newsletters:

The East Corridor Newsletter September 2004 (English version, 1.5M)

The East Corridor Newsletter September 2004 (Spanish version, 1.5M)

The East Corridor Newsletter Fall 2005 (English version, 881K)

The East Corridor Newsletter Fall 2005 (Spanish version, 917K)

Public Meeting Handouts:

Public Meeting Presentation Handout from Sept 27-29, 2005

Public Meeting handouts from Sept. 14, 2004

Link to East Corridor Project Website (No Longer in Use):

www.theeastcorridor.org